Deutsch
 
Datenschutzhinweis Impressum
  DetailsucheBrowse

Datensatz

DATENSATZ AKTIONENEXPORT
  Reducing stranded assets through early action in the Indian power sector

Malik, A., Bertram, C., Després, J., Emmerling, J., Fujimori, S., Garg, A., Kriegler, E., Luderer, G., Mathur, R., Roelfsema, M., Shekhar, S., Vishwanathan, S., Vrontisi, Z. (in press): Reducing stranded assets through early action in the Indian power sector. - Environmental Research Letters.
https://doi.org/10.1088/1748-9326/ab8033

Item is

Dateien

einblenden: Dateien
ausblenden: Dateien
:
9005oa.pdf (Verlagsversion), 882KB
Name:
9005oa.pdf
Beschreibung:
-
Sichtbarkeit:
Öffentlich
MIME-Typ / Prüfsumme:
application/pdf / [MD5]
Technische Metadaten:
Copyright Datum:
-
Copyright Info:
-
Lizenz:
-

Externe Referenzen

einblenden:

Urheber

einblenden:
ausblenden:
 Urheber:
Malik, Aman1, Autor              
Bertram, Christoph1, Autor              
Després, J.2, Autor
Emmerling, J.2, Autor
Fujimori, S.2, Autor
Garg, A.2, Autor
Kriegler, Elmar1, Autor              
Luderer, Gunnar1, Autor              
Mathur, R.2, Autor
Roelfsema, M.2, Autor
Shekhar, S.2, Autor
Vishwanathan, S.2, Autor
Vrontisi, Z.2, Autor
Affiliations:
1Potsdam Institute for Climate Impact Research, ou_persistent13              
2External Organizations, ou_persistent22              

Inhalt

einblenden:
ausblenden:
Schlagwörter: -
 Zusammenfassung: Cost-effective achievement of the Paris Agreement's long-term goals requires the unanimous phase-out of coal power generation by mid-century. However, continued investments in coal power plants will make this transition difficult. India is one of the major countries with significant under construction and planned increase in coal power capacity. To ascertain the likelihood and consequences of the continued expansion of coal power for India's future mitigation options, we use harmonised scenario results from national and global models along with projections from various government reports. Both these approaches estimate that coal capacity is expected to increase until 2030, along with rapid developments in wind and solar power. However, coal capacity stranding of the order of 133–237 GW needs to occur after 2030 if India were to pursue an ambitious climate policy in line with a well-below 2 °C target. Earlier policy strengthening starting after 2020 can reduce stranded assets (14–159 GW) but brings with it political economy and renewable expansion challenges. We conclude that a policy limiting coal plants to those under construction combined with higher solar targets could be politically feasible, prevent significant stranded capacity, and allow higher mitigation ambition in the future.

Details

einblenden:
ausblenden:
Sprache(n):
 Datum: 2020-03-16
 Publikationsstatus: Angenommen
 Seiten: -
 Ort, Verlag, Ausgabe: -
 Inhaltsverzeichnis: -
 Art der Begutachtung: Expertenbegutachtung
 Identifikatoren: DOI: 10.1088/1748-9326/ab8033
PIKDOMAIN: RD3 - Transformation Pathways
eDoc: 9005
MDB-ID: yes - 3020
Research topic keyword: Climate Policy
Research topic keyword: Energy
Research topic keyword: Decarbonization  
Research topic keyword: Mitigation
Research topic keyword: 1.5/2°C limit
Model / method: Model Intercomparison
Model / method: REMIND
Model / method: MAgPIE
Regional keyword: Asia
Organisational keyword: RD3 - Transformation Pathways
 Art des Abschluß: -

Veranstaltung

einblenden:

Entscheidung

einblenden:

Projektinformation

einblenden:

Quelle 1

einblenden:
ausblenden:
Titel: Environmental Research Letters
Genre der Quelle: Zeitschrift, SCI, Scopus, p3, oa
 Urheber:
Affiliations:
Ort, Verlag, Ausgabe: -
Seiten: - Band / Heft: - Artikelnummer: - Start- / Endseite: - Identifikator: CoNE: https://publications.pik-potsdam.de/cone/journals/resource/150326